Image slot — Hero · 2400×1600 · verandah in late afternoon, long shadows, furnished and in use
a roomwith no walls.
A verandah either looks like part of the house or it looks like something bolted to the back of it. The difference is design, and it's decided long before anyone picks up a tool.
Built to the house,
not to a catalogue.
Every property has different levels, different existing structures, different access and a different roofline to meet. We design the structure to your site — aluminium, timber or steel framed, with the roofing that suits the job.
Where the design calls for it, the same structure can carry an Eclipse opening roof, screening for privacy and wind, integrated lighting, and the stormwater and drainage work to go with it.
Powder-coated aluminium. Slim sections, no rust, no repainting, and the widest colour range — the usual choice where the structure should read as architecture rather than as timber.
Timber. Warmer and heavier in appearance, and the natural match for a home that already uses timber outside. Needs periodic finishing.
Steel. The strongest of the three, so it spans furthest with fewest posts — the answer when you want a wide opening left clear.
Which one suits your site depends on span, fixing points, exposure and the existing house.
Pavilions, verandahs, pergolas and carports — designed in 3D, engineered and approved.
What you get,
in writing.
- Framing
- Aluminium, timber or steel
- Roofing
- Solid, insulated or opening
- Design
- 3D CAD concept plans
- Documentation
- Full building documentation
- Approvals
- Council approvals coordinated
- Built by
- Licensed general builders
Your project,
managed from start to finish.
A covered outdoor area is building work. It needs footings, engineering, drainage, often council approval — and one company holding the whole thing together.
01 Your enquiry
You tell us about the property, how you want to use the space, and roughly what you have in mind. Photographs, plans, approximate measurements and inspiration images all help.
- The type of project you're considering
- Where the property is
- How you want to use the space
- Any size, access or site constraints you know about
- Products or design ideas you like
- Your anticipated timing and budget
A first conversation to work out whether we're the right fit for the project, and what we'll need from you next.
02 Site consultation
One of our team visits the property. This is a conversation about how you live outside, not just a measuring appointment.
- How the area is used now, and what isn't working
- Appearance, materials and colours
- Sun, weather protection, ventilation and privacy
- Roof, screening, lighting and drainage requirements
- How the new structure meets the existing house
- Access and construction considerations
- Whether planning, engineering or council approval is likely
Expect questions about your lifestyle and the property, and how you want the finished area to feel and function. Initial measurements are usually taken so a proposal can be prepared.
03 Concept, scope and quotation
We develop the proposed scope and put a price to it — what's being built, what's included, and what still needs confirming.
- The proposed structure and indicative dimensions
- Roofing or louvre system, beams, posts and framing
- Screens, cladding and architectural features
- Electrical and lighting allowances
- Stormwater and drainage
- Required building and finishing works
- Exclusions, assumptions and items requiring confirmation
Read the scope, inclusions and exclusions rather than comparing on price alone. Two outdoor areas that look alike can need entirely different structural, approval and construction solutions.
04 Acceptance, contract and deposit
When you decide to proceed, the proposal and scope are formally accepted, the contract is signed and the deposit paid.
- Sign the contract and acceptance documents
- Pay the deposit
- Confirm contact and property details
- Provide any existing plans or documents
- Begin your colour, finish and product selections
The project is not ready to build the moment a quote is accepted. Detailed design, approvals, selections, check measure, procurement and scheduling all still come first.
05 Detailed design, drafting and engineering
The concept becomes a buildable structure, and the join to the existing house is resolved properly.
- Project drawings and structural layout
- How the new roofline meets the existing fascia, gutter or wall
- Engineering documentation, connection and footing details
- Roof falls, drainage and flashing details
- Beam, post and framing sizes for the span
- Any unusual or site-specific construction conditions
The junction with the existing building is where most verandahs are won or lost. It is worth the time it takes.
06 Planning and council approval
Some projects proceed without a formal development approval. Others need planning consent, building rules consent, or both.
- Preparation of drawings and supporting documents
- Submission to the relevant authority or private building surveyor
- Planning assessment and building rules assessment
- Responses to any requests for further information
- Final development approval
We guide and coordinate the approval process, but the decisions and the assessment timeframes belong to the authorities. Construction can't be scheduled as though approval is guaranteed.
07 Colours, materials and final selections
Before anything can be ordered, your selections need to be locked in.
- Aluminium frame colour
- Roof or louvre colour
- Screening colour and style
- Cladding or lining
- Guttering and downpipe colours
- Lighting and electrical controls
- Timber, decking, paving or finishing materials
- Outdoor kitchen finishes and appliances, where applicable
Colours read differently across samples, screens, photographs and finished materials — use physical samples where we can supply them. Late selections delay drafting, procurement, powder coating and construction.
08 Final check measure
Before key materials are manufactured, a site supervisor completes a detailed check measure of the actual site.
- Overall opening dimensions
- Beam and post lengths
- Attachment points
- Roof and fascia heights
- Falls and levels
- Access restrictions and existing structures
- Anything that has changed since the original quotation
- Any discrepancy between the drawings and the physical site
The check measure protects you and the project. It reduces the risk of incorrect fabrication and finds problems before materials arrive. Where the site differs materially from the original scope, we'll discuss an adjustment before proceeding.
09 Documentation and material ordering
The project is prepared for procurement — the least visible stage, and one of the most important.
- Final construction documentation and bill of materials
- Cutting and fabrication information
- Aluminium ordering and powder coating
- Roof, louvre and screening orders
- Control systems and motors
- Electrical coordination and special fabrication
- Fixings, flashings and drainage components
Custom-made and powder-coated items generally can't be changed once they're ordered.
10 Construction scheduling
Once approvals, documentation and critical materials are far enough along, the project moves into the construction program.
- Material availability and supplier lead times
- Powder-coating turnaround
- Trade availability and project duration
- Site access and weather
- Sequencing with electrical, building and specialist trades
- Any access restrictions or commitments on your side
An estimated construction period may be discussed earlier, but a firm start date depends on approvals, selections, material readiness and the program. Weather and unexpected site conditions affect outdoor work.
11 Preparing the property
A short list of things we'll ask you to do before the crew arrives.
- Clear access to the work area
- Move vehicles, furniture, pots and personal items
- Protect or remove fragile items
- Provide access to power and water
- Make arrangements for pets
- Tell us about alarms, gates or access procedures
- Keep children and other occupants clear of the work area
- Confirm any known underground services
We work to minimise disruption, but expect some noise, dust and deliveries — the site stays an active construction area until the work is finished.
12 Construction and installation
Building begins, in accordance with the approved scope and documentation.
- Site preparation, footings and structural supports
- Posts, beams and framing
- Roof or louvre installation
- Flashings, gutters and stormwater connections
- Screens and architectural elements
- Electrical preparation and fit-off
- Carpentry, lining and finishing work
- Testing and adjustment
- Removal of construction waste from the contracted work
Not every condition can be seen before construction starts. Hidden building conditions, undocumented services or requested changes may need discussion. Work outside the accepted scope is documented and approved as a variation first — except where immediate action is needed to make the site safe.
13 Quality review and practical completion
As the work approaches completion, the project is reviewed and tested with you.
- Checking the structure and finishes
- Testing an opening roof and its controls
- Checking movement, alignment and drainage
- Completing minor adjustments
- Recording any outstanding items
- Cleaning the immediate work area
- Explaining how to operate and care for the products
Practical completion means the contracted project is substantially finished and usable. Take part in the review and raise anything you've noticed promptly so it can be assessed and recorded.
14 Handover, final account and aftercare
You receive the operating information, warranties and care instructions, and the final account is issued per the contract.
- Contracts and approved variations
- Product instructions and warranty information
- Colour and finish details
- Approval documentation
- Maintenance records
Outdoor structures and mechanical systems need reasonable care. Keep gutters and drainage paths clear, operate moving parts as instructed, and report any developing issue before it causes further damage.
Shade that looks like it belongs.
Questions people ask
before they start.
Can you match it to my existing roofline?
That is usually the point of designing rather than ordering. How the new structure meets the existing fascia, gutter, wall and roof pitch is worked through at the design stage and documented before anything is made.
Aluminium, timber or steel — which should I choose?
It depends on the span you need to clear, the fixing points available, how exposed the area is and what the existing house is made of. We will talk through the trade-offs at the site consultation rather than push one system.
How long will my project take?
It depends on scope, design requirements, approvals, selections, supplier lead times and the construction program. We'll give you guidance as the project progresses, but an installation date generally can't be confirmed until approvals and materials are far enough along.
Do I need council approval?
Not every project does. It depends on the property, the structure, the location and the proposed work. We'll advise whether an approval pathway looks necessary and what documentation would be required.
Is the first site measurement the final measurement?
Not necessarily. Initial measurements are usually used to prepare the concept and quotation. A detailed check measure is normally completed before key materials are ordered or fabricated.
Can I make changes after accepting the quote?
Often, yes — but changes can affect price, drawings, engineering, approvals, ordering and timing. Raise them as early as you can; they need to be documented before they're incorporated.
When do I choose my colours?
Selections usually happen after acceptance, and must be finalised before the relevant items are ordered or powder coated. We'll tell you which selections are needed and when.
What happens if something unexpected is found during construction?
We assess the condition and explain the impact on the work. Where additional work outside the accepted scope is required, it's generally documented as a variation for your approval.
Will you organise the other trades?
Coordination responsibilities are set out in the quotation and contract. We may coordinate the trades included in our scope, while customer-appointed or excluded works remain your responsibility.
What do I need to do before installation?
Generally: provide clear site access, remove furniture and belongings from the work area, secure pets, and tell us about any access restrictions or known site services.
Start with the site.
Tell us what you'd like to cover, how you want to use it and roughly when. We'll come and look before anyone talks about price.
The enquiry form couldn’t load here.
It will open in a new tab instead — or call us and we’ll take the details over the phone.
Still loading — if it doesn't appear, open the enquiry form in a new tab or call (08) 8123 3071.